09 — CASE STUDY / 2026
Reonic — AI Operating System for Renewable Installers
A case study on an AI operating system for renewable installers — from quoting and site design to scheduling and handover.
How this study was done
Context
Installers lose margin between the first customer enquiry and the finished installation: quoting is slow, site data is inconsistent, and scheduling collapses when reality shifts.
Approach
I walked the installer journey from lead to commissioning, measured where hours and rework accumulate, and separated the steps that need field judgement from the ones software should own.
What I proposed
An operating layer that turns site input into an accurate quote and design fast, keeps scheduling honest as jobs change, and hands crews a single source of truth on site.
How to read the deck
The deck above walks through the market context, the workflow analysis, the proposed product, the metrics, and the risks.
Weflow202613
NeuroNation202614
Superchat2026